An engineering company used simulation technology to determine the capability of its existing equipment relative to its operating modes. They needed to determine if a third compressor train is required to meet unstable demand so they used a desktop modeling studio to build a digital representation of their reservoir and conducted a Reliability-Maintainability-Availability (RAM) analysis. With valuable insight gained from the simulation, the team was able to conclude that the existing two compressor trains could continue to meet the reservoir’s needs.